References
Images
The RIALTO® system has already been installed on several RFI and FER (Ferrovie Emilia-Romagna) railway bridges since 2014.
The installation was carried out by leading companies operating in the railway sector and qualified to operate on operational lines. Below is a brief gallery of images of the various interventions.