At the valley points, before installing the membrane, it is necessary to arrange the water collection wells, which will thus be located under special holes in the membrane through which the water will be intercepted.
The system is completed with the installation of a drainage pipe for the water collected from the well which extends with an adequate slope to the nearest outlet (guard ditch, watercourse, etc.).
All joints between the well and the pipes must be made with electro-welded connection sleeves, to achieve perfect sealing of the entire system.