The waterproof layer: placed underneath the railway bed, it was once created on site using cast bitumen and sand. Subsequently, we moved on to the use of prefabricated and heat-welded bituminous membranes. Recently, we have returned to the use of sheaths made on site, with new generation bitumen, reinforced with special fabrics.
The protection layer: placed above the waterproof layer, since this does not have adequate resistance to the stresses transmitted by the stone above. It is generally made of concrete or bituminous conglomerate.
To overcome the limitations of traditional systems, waterproofing systems called ‘loose – laid’ (i.e. laid without gluing) have been tested, both in Italy and abroad.
One of these systems, qualified and used by RFI, involves the use of polyurea sprayed on site on geotextile sheets, previously laid underneath the ballast and protected above by further placed geotextile sheets.
Despite having an undoubted advantage in terms of speed of installation, the afore mentioned systems present the following drawbacks.
Spray installation of polyurea is strongly affected by the weather conditions during installation and in case of rain or frost it may be impossible. However, the weather conditions for installation can never be determined well in advance, as required by the scheduling of interruptions.